This is sample demo content. Replace it with your own article.
Choosing an installer is as important as choosing panels. Ask about warranties (panel, inverter, workmanship), who handles DISCOM and net-metering paperwork, what structure and cabling standards they follow, and whether after-sales service is local.
- What is the total cost, including structure, wiring, meters and paperwork?
- Which panel and inverter brands are proposed, and what are their warranties?
- Who applies for net metering and subsidy, and what documents are needed?
- What is the expected timeline from advance payment to commissioning?